A pump can fill a tank with water in 2 hours.
A pump can fill a tank with water in 2 hours. Because of a leak, it took 2 1/6 hours to fill the tank. The leak can drain all the water of the tank in?
Answer/Solution
26 hr
Steps/Work
Work done by the tank in 1 hour
= (1/2 - 2 1/6)
= 1/26 Leak will empty the tank in 26 hrs.
Answer:E
= (1/2 - 2 1/6)
= 1/26 Leak will empty the tank in 26 hrs.