A metal company's old machine makes bolts at a constant rate of 100 bolts per hour.

A metal company's old machine makes bolts at a constant rate of 100 bolts per hour. The company's new machine makes bolts at a constant rate of 150 bolts per hour. If both machines start at the same time and continue making bolts simultaneously, how many minutes will it take the two machines to make a total of 450 bolts?

Quiz

Answer/Solution

108

Steps/Work

Old Machine
100 bolts in 60 mins
so,
5/3 bolts in 1 min
New Machine
150 bolts in 60 mins
so,
5/2 bolts in 1 min
together,
5/3 + 5/2 =
25/6 bolts in 1 min
so, for 450 bolts
450 * 6 / 25 = 108 mins
Ans E

Physics Calculator / Auto Solver

A metal company's old machine makes bolts at a constant rate of bolts per hour. The company's new machine makes bolts at a constant rate of bolts per hour. If both machines start at the same time and continue making bolts simultaneously, how many minutes will it take the two machines to make a total of bolts?

Calculated Answer

108

Step by Step Solution

In order to solve problem, you must evaluate n2 / (n0 / 60 + n1 / 60).

n0 =100
n1 =150
n2 =450