A can complete a work in 18days and B can do the same work in 10days.
A can complete a work in 18days and B can do the same work in 10days. If A after doing 3days, leaves the work, find in how many days B will do the remaining work?
Answer/Solution
8days
Steps/Work
The required answer = (18-3)*5 / 18 = 150/18 = 8days
Answer is B